Back to Portfolio
ERP Manufacturing Building Materials Live in Production

Epicor BisTrack:
Simplifying Manufacturing Workflows

A UX redesign of core manufacturing and building-materials workflows inside Epicor BisTrack — simplifying complex production and inventory tasks for the frontline operations staff who run them day to day.

My Role
Senior UX Designer
Focus Areas
Production Workflow · Inventory · Usability
Platform
Web (Epicor BisTrack)
Tools
Figma · Epicor Design System
Live
In Production
Solo
UX Decision-Maker
Epicor DS
Design System Aligned
Dev-Ready
Handoff Specs

The Challenge

Epicor BisTrack serves manufacturing and building-materials businesses — distributors and producers who need to track production, inventory and fulfillment with precision. The product's workflows had accumulated real complexity over time, and that complexity had migrated straight into the UI, with little regard for how frontline operations staff actually experience a shift.

My goal was to simplify the core production and inventory workflows without stripping out the capability that makes BisTrack powerful for this industry — making the product easier to learn and faster to operate for the people running it every day.

Owning the UX End to End

I was the UX decision-maker for this workflow redesign, responsible for diagnosing where complexity was hurting usability and designing simplified flows that still supported the full range of manufacturing and inventory operations.

Production Workflow
Redesigned how operations staff track and progress production tasks from start to completion.
Inventory Workflow
Simplified inventory lookup and adjustment tasks that staff perform repeatedly throughout a shift.
Usability Evaluation
Evaluated existing workflows directly against real operations tasks to identify where complexity was costing time and causing errors.
Cross-Functional Partnership
Partnered with product and engineering to validate that simplified flows were feasible within BisTrack's existing platform architecture.

Understanding the Workflow

I worked through the existing production and inventory workflows as operations staff experience them — mid-shift, under time pressure, needing accurate information fast. Three structural problems stood out.

Before — What Broke Down
Production status required navigating through several screens to assemble a full picture
Inventory adjustments mixed high-frequency actions with rarely-used edge-case options in the same view
Terminology and field labels assumed deep familiarity with BisTrack's internal data model
No clear visual distinction between in-progress, completed and blocked production tasks
After — What We Changed
Consolidated production status into a single view showing progress at a glance
Separated high-frequency inventory actions from advanced, rarely-used options
Clarified terminology and labels to match how operations staff actually describe their work
Added clear status indicators distinguishing in-progress, completed and blocked tasks
Production status view — consolidated progress tracking for manufacturing tasks
Fig. 1 — The consolidated production status view, replacing a multi-screen status-checking process.

Key UX Improvements

Four decisions drove the redesign, each focused on reducing the cost of complexity without reducing the product's underlying capability.

Consolidated Production Status
Brought production progress, blockers and completion state into a single consolidated view instead of requiring navigation across several screens.
WHY
Operations staff need to answer "where are we right now?" quickly and often. Scattering that answer across multiple screens turned a simple check into a multi-step task, repeated many times a shift.
Separated Common from Advanced Inventory Actions
Split high-frequency inventory actions from advanced, edge-case options, so the everyday task is never buried behind rarely-used controls.
WHY
Mixing common and rare actions in one view meant every staff member had to visually parse options they'd almost never use, just to find the one they needed right now.
Operations-Language Terminology
Rewrote field labels and terminology to match the language operations staff actually use, rather than the underlying data model's naming.
WHY
When the UI speaks in data-model terms, every new hire has to learn two things at once — the job and the software's internal vocabulary. Matching real operations language removed that second learning curve.
Clear Task-Status Indicators
Added consistent visual indicators distinguishing in-progress, completed and blocked production tasks across every relevant screen.
WHY
Without a clear, consistent status signal, staff had to read task details just to tell whether something was stuck. A glanceable status indicator turned that into an instant visual check.
Inventory workflow interface — common actions separated from advanced configuration
Fig. 2 — The redesigned inventory workflow, separating everyday actions from advanced options.

How I Approached the Redesign

I approached this the way operations staff experience their shift — task by task — then validated every simplification against what BisTrack's underlying data model and platform could actually support.

01
Evaluate
Worked through real production and inventory tasks in the existing product to find where complexity was costing time
02
Consolidate
Brought scattered production status information into a single consolidated view
03
Simplify Flows
Separated high-frequency actions from advanced options and rewrote terminology into operations language
04
Validate with Engineering
Confirmed every simplified flow against BisTrack's existing data model and platform constraints
05
Ship & Monitor
Shipped the simplified production and inventory workflows, now live in production

Design-System Alignment & Engineering Collaboration

The redesigned workflows were built from Epicor's existing design-system components wherever possible, keeping BisTrack's manufacturing-specific screens visually and behaviorally consistent with the broader Epicor product family.

Because production and inventory data in BisTrack is deeply interconnected, I worked closely with engineering to confirm which status states, data groupings and terminology changes were accurate reflections of the underlying system — not just a cleaner-looking surface.

Design-system component mapping — status, list and workflow patterns reused from Epicor's existing library
Fig. 3 — Component mapping showing how the BisTrack redesign reused Epicor's existing design-system patterns.

Outcome

The simplified production and inventory workflows are live in production inside Epicor BisTrack. Operations staff now get a consolidated view of production status, a clearer separation between everyday and advanced inventory actions, and terminology that matches how they actually talk about their work.

Complexity in the data model doesn't have to mean complexity in the interface. The job was to absorb that complexity in the design, not pass it on to the person running the shift.
— Key Takeaway

Project Reflection

A few directions I'd want to take this work next.

01
Document Task-Completion Challenges
Formally document the specific task-completion challenges observed during evaluation, to build a concrete baseline for measuring future improvements.
02
Usability Testing with Operations Roles
Run moderated usability sessions specifically with the operations and production roles who use these workflows daily, rather than relying solely on expert evaluation.
03
Track Reusable Pattern Adoption
Track how widely the consolidated-status and common/advanced-separation patterns get adopted across other BisTrack workflow areas facing similar complexity.
04
Extend Terminology Review
Extend the operations-language terminology review to adjacent reporting and admin screens that still reflect the underlying data model's naming.
Next Case Study
Epicor Payment Gateway UX